A collation of many blocks of liquid form resulted in effect of surprisingly carved forms well embedded with the surroundings. Yielding of a large building helped to avoid the impression of its massiveness. Due to the high sensitivity of the investor was able to take care of thoughtful architectural details and landscaping around the building. The facility will be completed in 2013, and then allow a full presentation with interesting interior design by me.
localized: | ul. Odrodzenia, Czestochowa |
usable floor area: | 1.170,0m² |
design: | 2008 - 2009 |
construction: | 2009 - 2013 |