Production hall and the office building are parts of this industrial complex. According to the spirit of industial architecture steel and concrete were the main materials used for the construction. The modern character of the solution is underlined by large glass surfacess on the facades joined with aluminium panels. All the inwestment was done within 7 months due to the cooperation between all sides of the investment.
localized: | ul. Skarszewska 11, Tczew |
usable floor area of hall: | 11068,8m² |
usable floor area of office building: | 1265,9m² |
design: | 2003 - 2004 |
construction: | 2004 |
client: | Press-Glas sp. z o.o. |